S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
212. The authorization holder must immediately notify the Minister where any of the following incidents occurs:
(1)  the maximum pressure provided for in the technical program is exceeded;
(2)  the volume of fluid rising to the surface exceeds the volume anticipated;
(3)  the holder has reasons to suspect a flaw in the casing or the casing cement, or the absence of isolation of a source of usable groundwater aquifer.
O.C. 1252-2018, s. 212.
In force: 2018-09-20
212. The authorization holder must immediately notify the Minister where any of the following incidents occurs:
(1)  the maximum pressure provided for in the technical program is exceeded;
(2)  the volume of fluid rising to the surface exceeds the volume anticipated;
(3)  the holder has reasons to suspect a flaw in the casing or the casing cement, or the absence of isolation of a source of usable groundwater aquifer.
O.C. 1252-2018, s. 212.